动床河流
Through the experiment on movable bed model of river engineering and combining theoretical analysis, the effects of deposition falling with tranquil flow of permeable pile dike for bank protection applied to the Yellow River and local scouring process near the pile pillar have been studied.
通过河工动床模型试验,结合理论分析,对护岸式透水桩坝应用于黄河的缓流落淤效果及桩柱附近局部冲刷过程进行了研究。
The effects of permeable pile groynes laid out along the thalweg in control and guide the regime of the lower Yellow River have been studied through movable bed model tests.
通过河工动床模型试验,对沿治导线布设形式的透水桩坝在黄河下游控导河势的效果进行了研究。
纳米英语 · 双语娱乐资讯
纳米英语 · 中考英语